Piping Hydrotest Supervisor

Job Category:  Engineering
Contract Partner Company:  Arabelle Solutions
Employing Company:  NRL Ltd

The HPC Jobs Service supports local people into exciting, long-term careers across our Project.

Piping Hydrotest Supervisor
Arabelle Solutions
HPC

 

Fixed Term

 


Responsibilities

 
1. Supervision of the subcontractor’s personnel 
• To ensure that the works are completed on time and within Arabelle Solutions specification and quality; 
• Ensure that the established Pressure Test Procedure are in-place and properly enforced at site. 
• Ensure that System Test Packages are well prepared, properly filled-up and completed according to the test package preparation procedure. 
• Ensure that the system has been lined-up in accordance with the marked-up P&ID drawing in reference to Pressure Test Procedure. 
• Ensure that all the necessary work preparation to be done before the Pressure Test is well performed and completed (e.g. valves isolation, blinds, supports, vents/drains/filling points, pressure test pumps, gauges, water source/quality, spring supports blocking, etc.) 
• Ensure the availability of test instrument/gauges Certificate of Calibration and its validity. 
• Reporting of any deficiency/discrepancy observed/detected during inspection monitoring work-phase (e.g. NCR or Punchlist). 
• System final visual inspection check prior to commencement of filling/hydrotesting. 
• Perform visual inspection during/entire pressure testing of any sign of leakage. 
• Ensure the presence of all the concerned responsible and persons involved in the pressure testing in all stages of pressurization and testing. 
• Ensure the provision and completeness of all the relevant Pressure Test Reports and obtain the signature from all the parties involved. 
• Ensure that all the works to be done after the completion of pressure test are listed and performed (e.g. removal of all the temporary device, blinds, plugs, supports, etc). 
• To be acquainted with contract(s) of subcontractors for defined scope; 
• To verify and report work done by subcontractors for defined scope; 
• Identifying materials and tools/equipment required to execute the works within the discipline; 
• Validate material request form issued by Subcontractors;  
• Ensuring discipline works are being executed in a manner that optimises the completion of the turn over packages for commissioning; 
• Communication directly with site erection management to resolve and/or clarify any technical issues. 
 

2. Executing the discipline works erection strategy 
• Executing the discipline works erection strategy as defined by the Overall Construction Manager and promulgated by the discipline Construction Manager (including planning aspects); 
• Communicate with engineering to resolve and/or clarify any technical issues. All nonconformances, discrepancies and cost variances are fairly and properly reported and managed, while minimising impact to Arabelle Solutions; 
• Follow and duly close allocated FSI and NCR. 
 

3. Executing of mandatory and conformity tests  
• Check ITPL availability to Subcontractor, to ensure all ITPL and LAD are in order prior to the commencement of the discipline works;  
• Schedule and organise inspections and test as per ITPL; 
• Participate to CTO and TOP walk down; 
• Check correctness, compliance and correct use of any material or consumable supply by subcontractors. 
 

4. Clear allocated Punch-Items 
• Record and communicate outstanding works during erection inspections and random walk down; 
• Constant checking to ensure discrepancies/punch list items are promptly resolved and signed off. 
 

5. Checking correct and timeliness preparation of SWCF by subcontractor 
• Managing and maintaining the creation of as-built (Record) documentation within the scope of the discipline works; 
• Ensure that the physical quality records within the scope of the discipline works are properly filled, signed and compiled, in parallel to the electronic copy; 
• Creating or directly supervising the creation of as-built (Record) documentation within the scope of the discipline works. 
 

6. Quality and EHS implementation 
• Implementation within the discipline’s scope of works of Arabelle Solutions EHS and Quality policy; 
• Providing co-workers with information about hazards, risks and elimination measures applicable to the site; 
• Implementation of specific EHS Plan; 
• Ensure approved site inspection and test plan (ITPL) are used by subordinate and subcontractors / partners as defined by Arabelle Solutions (including by performing spot check); 
• Ensure quality records are generated progressively in parallel of erection activity; 
• Check and review SWCF with Quality Department; 
• Coordinate with Quality Department all quality control on Site; 
• Implement NCC process; 
• Support any quality initiative at site as 8D, root cause analysis, continuous improvement; 
• Enforce Arabelle Solutions EHS directive (High risk activities, control of contractor, lockouttag out, electrical safety, mechanical safety, work at height, excavation work, lifting operation, vehicle movement); 
• Daily toolbox talk with subcontractor team;  
 

7. REX (Return of Experience) 
• REX on applicable standards (EG, GS, etc.) and major site deviations. 
 

8. Reporting 
• Prepare data on overall progress, completed activity, forecast to completion, problem encountered, subcontractor’s performance, EHS report, NCC and Cost follow-up, material problems, manpower report, etc. 


Key Performance Indicators  
• All works assigned to the supervisor within the discipline are completed according to schedule and in accordance with technical and QA/QC requirements; 
• SWCF progressively  compiled by Subcontractors and reviewed;  
• EHS targets are achieved. 


Specific Functional / Technical Authority (Besides DoA) 
• To represent and execute the requirements, directives and policies of Arabelle Solutions directly to subcontractors; 
• To immediately suspend work proceeding in a non-compliant or dangerous manner; 
• To remove from the work area any subcontractor personnel refusing to comply with Arabelle Solutions directives; 
• To review and accept or request clarification on any documentation for the assigned scope of the works. 


Job Specifics 
• Active and positive in solving problems; 
• Willing to take responsibility; 
• Attention to details; 
• Exhibits common sense, is respectful and loyal; 
• Open-minded for change and new ideas; 
• Goals oriented; 
• Undertake any other duty and responsibility as may be required by the respective leads; 
• Promote and champion “We Put Quality First” and EHS “All together”; 
• Adhere to Arabelle Solutions Code of Ethics and Values. 
 

Qualifications and Experience


Education

Mandatory (MUST
• Diploma or certificate in a technical discipline. 

 
Desirable (NICE TO HAVE)

• Appropriate formal internal training in power plant construction and engineering. 


Professional Experience  

Mandatory (MUST) 
• Experience in site construction execution and managing of prefabrication subcontractors;  
• General knowledge of power plant systems; 
• Knowledge within the discipline. 
 

Desirable (NICE TO HAVE) 
• Multicultural – able to interact with people of different cultures. 
 

 

Language Skills 

Mandatory (MUST) 
• Fluent in English (oral & written) 
 


Desirable (NICE TO HAVE) 
• Any other languages. 

 

For this role you must have evidence of right to work in the UK. As a project, we do not discriminate on the grounds of age, gender, race, colour, religion, disability or sexual orientation, and we welcome applications from all sections of the community.

The HPC Jobs Service supports local people into exciting, long-term careers across our Project.

Piping Hydrotest Supervisor
Arabelle Solutions
HPC

 

Fixed Term

 


Responsibilities

 
1. Supervision of the subcontractor’s personnel 
• To ensure that the works are completed on time and within Arabelle Solutions specification and quality; 
• Ensure that the established Pressure Test Procedure are in-place and properly enforced at site. 
• Ensure that System Test Packages are well prepared, properly filled-up and completed according to the test package preparation procedure. 
• Ensure that the system has been lined-up in accordance with the marked-up P&ID drawing in reference to Pressure Test Procedure. 
• Ensure that all the necessary work preparation to be done before the Pressure Test is well performed and completed (e.g. valves isolation, blinds, supports, vents/drains/filling points, pressure test pumps, gauges, water source/quality, spring supports blocking, etc.) 
• Ensure the availability of test instrument/gauges Certificate of Calibration and its validity. 
• Reporting of any deficiency/discrepancy observed/detected during inspection monitoring work-phase (e.g. NCR or Punchlist). 
• System final visual inspection check prior to commencement of filling/hydrotesting. 
• Perform visual inspection during/entire pressure testing of any sign of leakage. 
• Ensure the presence of all the concerned responsible and persons involved in the pressure testing in all stages of pressurization and testing. 
• Ensure the provision and completeness of all the relevant Pressure Test Reports and obtain the signature from all the parties involved. 
• Ensure that all the works to be done after the completion of pressure test are listed and performed (e.g. removal of all the temporary device, blinds, plugs, supports, etc). 
• To be acquainted with contract(s) of subcontractors for defined scope; 
• To verify and report work done by subcontractors for defined scope; 
• Identifying materials and tools/equipment required to execute the works within the discipline; 
• Validate material request form issued by Subcontractors;  
• Ensuring discipline works are being executed in a manner that optimises the completion of the turn over packages for commissioning; 
• Communication directly with site erection management to resolve and/or clarify any technical issues. 
 

2. Executing the discipline works erection strategy 
• Executing the discipline works erection strategy as defined by the Overall Construction Manager and promulgated by the discipline Construction Manager (including planning aspects); 
• Communicate with engineering to resolve and/or clarify any technical issues. All nonconformances, discrepancies and cost variances are fairly and properly reported and managed, while minimising impact to Arabelle Solutions; 
• Follow and duly close allocated FSI and NCR. 
 

3. Executing of mandatory and conformity tests  
• Check ITPL availability to Subcontractor, to ensure all ITPL and LAD are in order prior to the commencement of the discipline works;  
• Schedule and organise inspections and test as per ITPL; 
• Participate to CTO and TOP walk down; 
• Check correctness, compliance and correct use of any material or consumable supply by subcontractors. 
 

4. Clear allocated Punch-Items 
• Record and communicate outstanding works during erection inspections and random walk down; 
• Constant checking to ensure discrepancies/punch list items are promptly resolved and signed off. 
 

5. Checking correct and timeliness preparation of SWCF by subcontractor 
• Managing and maintaining the creation of as-built (Record) documentation within the scope of the discipline works; 
• Ensure that the physical quality records within the scope of the discipline works are properly filled, signed and compiled, in parallel to the electronic copy; 
• Creating or directly supervising the creation of as-built (Record) documentation within the scope of the discipline works. 
 

6. Quality and EHS implementation 
• Implementation within the discipline’s scope of works of Arabelle Solutions EHS and Quality policy; 
• Providing co-workers with information about hazards, risks and elimination measures applicable to the site; 
• Implementation of specific EHS Plan; 
• Ensure approved site inspection and test plan (ITPL) are used by subordinate and subcontractors / partners as defined by Arabelle Solutions (including by performing spot check); 
• Ensure quality records are generated progressively in parallel of erection activity; 
• Check and review SWCF with Quality Department; 
• Coordinate with Quality Department all quality control on Site; 
• Implement NCC process; 
• Support any quality initiative at site as 8D, root cause analysis, continuous improvement; 
• Enforce Arabelle Solutions EHS directive (High risk activities, control of contractor, lockouttag out, electrical safety, mechanical safety, work at height, excavation work, lifting operation, vehicle movement); 
• Daily toolbox talk with subcontractor team;  
 

7. REX (Return of Experience) 
• REX on applicable standards (EG, GS, etc.) and major site deviations. 
 

8. Reporting 
• Prepare data on overall progress, completed activity, forecast to completion, problem encountered, subcontractor’s performance, EHS report, NCC and Cost follow-up, material problems, manpower report, etc. 


Key Performance Indicators  
• All works assigned to the supervisor within the discipline are completed according to schedule and in accordance with technical and QA/QC requirements; 
• SWCF progressively  compiled by Subcontractors and reviewed;  
• EHS targets are achieved. 


Specific Functional / Technical Authority (Besides DoA) 
• To represent and execute the requirements, directives and policies of Arabelle Solutions directly to subcontractors; 
• To immediately suspend work proceeding in a non-compliant or dangerous manner; 
• To remove from the work area any subcontractor personnel refusing to comply with Arabelle Solutions directives; 
• To review and accept or request clarification on any documentation for the assigned scope of the works. 


Job Specifics 
• Active and positive in solving problems; 
• Willing to take responsibility; 
• Attention to details; 
• Exhibits common sense, is respectful and loyal; 
• Open-minded for change and new ideas; 
• Goals oriented; 
• Undertake any other duty and responsibility as may be required by the respective leads; 
• Promote and champion “We Put Quality First” and EHS “All together”; 
• Adhere to Arabelle Solutions Code of Ethics and Values. 
 

Qualifications and Experience


Education

Mandatory (MUST
• Diploma or certificate in a technical discipline. 

 
Desirable (NICE TO HAVE)

• Appropriate formal internal training in power plant construction and engineering. 


Professional Experience  

Mandatory (MUST) 
• Experience in site construction execution and managing of prefabrication subcontractors;  
• General knowledge of power plant systems; 
• Knowledge within the discipline. 
 

Desirable (NICE TO HAVE) 
• Multicultural – able to interact with people of different cultures. 
 

 

Language Skills 

Mandatory (MUST) 
• Fluent in English (oral & written) 
 


Desirable (NICE TO HAVE) 
• Any other languages. 

 

For this role you must have evidence of right to work in the UK. As a project, we do not discriminate on the grounds of age, gender, race, colour, religion, disability or sexual orientation, and we welcome applications from all sections of the community.

Why Join Us?

For more than 60 years, nuclear power stations in the UK have been quietly keeping Britain fuelled with massive amounts of home-grown energy.

Our teams up and down the country are proudly continuing to serve the nation – but they also have an eye on the future.

EDF is leading the UK's nuclear renaissance with the construction of a new nuclear power station at Hinkley Point C and plans for a new power station at Sizewell C in Suffolk.

Nuclear power is the most reliable, low-carbon energy source currently available to the UK. EDF is playing a key role in the development of nuclear sites, while Hinkley Point C will provide low-carbon electricity to meet 7% of the UK demand. The project is already making a positive impact on the local and national economy as well as boosting skills and education.

We’re not just building new nuclear power stations. We’re developing careers, upskilling generations and creating thousands of employment and apprenticeship opportunities across a variety of skills areas.

It takes a special kind of person to work in the nuclear energy industry and although we have thousands of them there’s always a need for more.

Our industry has a mind-boggling range of opportunities and more jobs, and in more places, than you might think. But it’s also an industry which is changing.

We’re a responsible business and proud to be Britain’s biggest generator of zero carbon electricity. With size, age and experience, we believe we can do even more.